Docket No. 466 - Bi-Weekly Progress Reports/Monthly Construction Reports
DOCKET NO. 466 - The Connecticut Light & Power Company d/b/a Eversource Energy application for a Certificate of Environmental Compatibility and Public Need for the Frost Bridge to Campville 115-kilovolt (kV) electric transmission line project that traverses the municipalities of Watertown, Thomaston, Litchfield, and Harwinton, which consists of (a) construction, maintenance and operation of a new 115-kV overhead electric transmission line entirely within existing Eversource right-of-way and associated facilities extending approximately 10.4 miles between Eversource’s existing Frost Bridge Substation in the Town of Watertown and existing Campville Substation in the Town of Harwinton; (b) related modifications to Frost Bridge Substation and Campville Substation; and (c) reconfiguration of a 0.4 mile segment of two existing 115-kV electric transmission lines across the Naugatuck River in the Towns of Litchfield and Harwinton within the same existing right-of-way as the new 115-kV electric transmission line.
Bi-Weekly Progress Reports
Monthly Construction Reports
Semi-Annual Status Reports
Operating Reports
1st Year Operating Report, 01/09/20
Council Acknowledgement of Report - Condition Compliance, 01/13/20
Council Acknowledgement of Report - Condition Compliance, 01/13/20