This is a beta website for the Connecticut Siting Council. Please visit the current CSC Website.

DOCKET NO. 483 - The United Illuminating Company application for a Certificate of Environmental Compatibility and Public Need for the Pequonnock Substation Rebuild Project that entails construction, maintenance, and operation of a 115/13.8-kilovolt (kV) gas insulated replacement substation facility located 700 feet southwest of UI’s existing Pequonnock substation on an approximately 3.7 acre parcel owned by PSEG Power Connecticut, LLC at 1 Kiefer Street, Bridgeport, Connecticut, and related transmission structure and interconnection improvements.

APPLICATION (recd. 4/26/2018)
   Appendices:
      Appendix A - Maps and Drawings
      Appendix B - Agency Correspondence
      Appendix C - Water Resources
      Appendix D - Visibility Analysis
      Appendix E - Cultural Resources Report
      Appendix F - Noise Analysis
      Appendix G - EMF Report
      Appendix H - Formal Requirements  
 Bulk:
      2.   City of Bridgeport Zoning Map
      6.   Municipal Consultation Filing
            Appendix A - Maps and Drawings  
            Appendix B - Agency Correspondence
           Appendix C - Water Resources
            Appendix D - Visibility Analysis
            Appendix E - Cultural Resources Report
            Appendix F - Noise Analysis
            Appendix G - EMF Report
PROCEDURAL CORRESPONDENCE
STATE AGENCY COMMENTS
          
MUNICIPAL COMMENTS
PUBLIC OFFICIAL COMMENTS
HEARING INFORMATION
         
PARTIES AND INTERVENORS
Applicant-The United Illuminating Company
Exhibits
Correspondence
Motions and Objections
Post Hearing Briefs and Draft Findings of Fact
Intervenor- PSEG Power Connecticut LLC
Exhibits
Correspondence
Motions and Objections
Post Hearing Briefs and Draft Findings of Fact
COUNCIL's DRAFT FINDINGS OF FACT
        
FINAL DECISION