To support essential travelers during the COVID-19 public health crisis, CTDOT has launched a temporary program for food trucks to operate at highway Rest Areas in Danbury (I-84), Middletown (I-91), Wallingford (I-91) and North Stonington (I-95). Read more here: Food Trucks Temporarily Permitted at CTDOT Highway Rest Areas

Construction News from the Connecticut Department of Transportation - 2019

Page 10 of 23

  • 8/28/2019 Pedestrian Upgrades along East Street in New Britain

    The Connecticut Department of Transportation is announcing that pedestrian upgrades will be performed on Route 174 (East Street) in New Britain, Tuesday, September 10, through Friday, September 13, 2019.

  • 8/28/2019 Bridge Membrane Project along I-395 in Putnam

    The Connecticut Department of Transportation is announcing that a bridge membrane project will be performed on I-395 Northbound and Southbound in Putnam on Wednesday, September 4, 2019. Rain date will be Thursday, September 5, 2019.

  • 8/28/2019 Bridge Maintenance along Interstate 95 in New London

    The Connecticut Department of Transportation is announcing that a bridge maintenance project will be performed on I-95 Southbound in New London, beginning Monday, September 9, through Friday, September 13, 2019.

  • 8/28/2019 Railroad Crossing Repairs on East Main Street in Plainville

    The Connecticut Department of Transportation is announcing that railroad crossing repairs will be performed on the Route 372 (East Main Street) crossing in Plainville, overnight Sunday-Monday, September 8-9, 2019.

  • 8/28/2019 Nighttime Bridge Maintenance along I-95 in Milford

    The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on I-95 North and South in Milford, Wednesday, September 11, through Friday, October 11, 2019.

  • 8/26/2019 Nighttime Bridge Maintenance along Interstate 95 in Milford

    The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on Interstate 95 North and South in Milford, Wednesday, September 4, through Friday, September 20, 2019.

  • 8/26/2019 Nighttime Resurfacing on Route 68 in Naugatuck

    The Connecticut Department of Transportation is announcing that a nighttime milling and resurfacing project will be performed on Route 68 (Bridge St), SR 723 (Union St., Golden Ct.) & SR 710 (North Main St.) in Naugatuck, Wednesday, August 28, through Friday, September 20, 2019. No work will be performed over the Labor Day weekend.

  • 8/26/2019 Nighttime Resurfacing Project on Route 44 (Winsted-Norfolk Road) in Winchester

    The Connecticut Department of Transportation is announcing that a nighttime resurfacing project will be performed on a 2.15-mile section of Route 44 in Winchester, Thursday, August 29, through Friday, September 20, 2019. No work will be performed over the Labor Day weekend.

  • 8/27/2019 DOT Press Release

  • 8/26/2019 Resurfacing Project on Route 159 in Suffield

    The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 159 in Suffield, Monday, August 26, through Friday, September 6, 2019.

  • 8/26/2019 Nighttime Resurfacing Project on Route 1 in Westport

    The Connecticut Department of Transportation is announcing that a nighttime milling and resurfacing project will be performed on a 1.85-mile section of Route 1 in Westport, Tuesday, September 3, through Wednesday, September 25, 2019.

  • 8/26/2019 Installations and Revisions of Traffic Control Signals in Various Cities and Towns

    The Connecticut Department of Transportation (Department) is developing plans to replace existing traffic control signal equipment to meet current Department standards at 14 locations in the cities/towns of Ashford, Columbia, Durham, East Hampton, East Lyme, Groton, Ledyard, Middletown, Montville, Old Lyme, Waterford, and Windham.

  • 8/25/2019 I-84 Widening Project is Finalist for National Award

    The Connecticut Department of Transportation's I-84 widening project in Waterbury is a finalist for a national award to be presented in October by the American Association of State Highway and Transportation Officials (AASHTO).

  • 8/20/2019 Resurfacing along Route 159 (East St. South) in Suffield and Windsor Locks

    The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on a 3.94-mile segment of Route 159 in Suffield, Tuesday, August 20, through Friday, September 6, 2019.

  • 8/20/2019 Nighttime Roadway Milling and Drainage Repair Project at I-395 Exit 45 off ramp in Putnam

    The Connecticut Department of Transportation is announcing that a nighttime roadway milling and drainage repair project will be performed at the Exit 45 off ramp to Kennedy Drive from I-395 Northbound in Putnam, overnight Monday-Tuesday, August 19-20, 2019. Rain date will be August 20-21, 2019.