Danbury Branch Electrification Feasibility Study
- Phase I Final Report Executive Summary
- Notice of Intent
- Coordination Plan
- Final Scoping Report
- Rail Infrastructure Report - Existing Conditions
- Existing Conditions Report
- Train Simulation Report for Alternatives
- Transit-Oriented Development Final Report
- Technical Summary Report
Environmental Technical Memorandum: Existing Conditions
- Cover and Introduction
- Section 1 - Topography, Geology, and Soils
- Section 2 - Noise and Vibration
- Section 3 - Air Quality
- Section 4 - Energy
- Section 5 - Biological Diversity
- Section 6 - Threatened and Endangered Species
- Section 7 - Wetlands
- Section 8 - Floodplains and Floodways
- Section 9 - Historic Resources
- Section 10 - Archeological Resources
- Section 11 - Prime Farmland and Active Farmland
- Section 12 - Land Use
- Section 13 - Hazardous Contamination
- Section 14 - Surface and Groundwater Resources
- Section 15 - Public Recreational/4(f)/6(f) Lands
- Section 16 - Socioeconomics and Environmental Justice
- Section 17 - Scenic Roads
- Section 18 - Visual Resources
Environmental Technical Memorandum: Impact Reports
- Section 1 - Topography, Geology, and Soils
- Section 2 - Noise and Vibration
- Section 3 - Air Quality
- Section 4 - Energy
- Section 5 - Biological Diversity
- Section 6 - Threatened and Endangered Species
- Section 7 - Wetlands
- Section 8 - Floodplains and Floodways
- Section 9.10 - Historic and Archaeological Resources
- Section 11 - Prime Farmland and Active Farmland
- Section 12 - Land Use
- Section 13 - Hazardous Contamination
- Section 14 - Surface and Groundwater
- Section 15 - Public Recreational/4(f)/6(f) Lands
- Section 16 - Socioeconomic and Environmental Justice
- Section 17 - Scenic Roads
- Section 18 - Visual Resources
Engineering Feasibility Report