To support essential travelers during the COVID-19 public health crisis, CTDOT has launched a temporary program for food trucks to operate at highway Rest Areas in Danbury (I-84), Middletown (I-91), Wallingford (I-91) and North Stonington (I-95). Read more here: Food Trucks Temporarily Permitted at CTDOT Highway Rest Areas

DEVELOPMENT

AEC Applications

PILOT PROJECTS

Description

Owner

Schedule Dates

Digital Contract Submittals

Clarify business processes for shop and working drawings for engineering, construction and the contractors

AEC Applications

Bridge Design

Construction

2/2017

Tentative Pilot Results

Pilot Form

Electronic Engineering Data (EED) Use & Delivery

Make use of high value engineering data for:

Design phase: More accurate estimates, visualization for presentations, clash detection for model review

Construction phase: layout, automated machine control, construction inspection

AEC Applications

2013 – 2/2016

Meetings with (CCIA)

4/2016

FHWA workshop on 3D Models

6/2016

Begin pilot delivery of EED at FDP

7/2016

Model Centric Design Open House

6/2017

Issue Phase 1 Directive

Pilot

Form

CTDOT Right of Way Map Mosaic

Provide spatially correct ROW map sheets and ROW lines

Link ROW map sheets to the associated section of roadway

AEC Applications

7/2016 – 1/2017

Pilot

Pilot Form

Maintenance & Collection of Sign Asset Information

Harvest information from the sign inventory data base and populate design files of proposed projects with the location of existing signs

Field verify the location of these signs using accurate hand-held mobile devices

Update the sign inventory data base with the field data collected and proposed design changes. 

AEC Applications

Traffic Engineering

11/2016 – 12/2016

Mobile Device Testing

10/2016 - 6/2017

GIS Portion

Pilot Form

Streamlined Digital Contract

Reduce the size of the paper contract

Use PDFs for easier exchange of information, searching, & storage

Construction & Contracts

TBD

Pilot Form

BLANK PILOT FORM