Construction News from the Connecticut Department of Transportation - 2019
Page 13 of 22
-
7/30/2019
Guiderail and Attenuator Installation on Route 34 in West Haven
The Connecticut Department of Transportation is announcing that a safety improvement project will be performed on a 0.47-mile section of Route 34 east and west in West Haven, Monday August 12, through Friday, September 13, 2019.
-
7/28/2019
Project No. 174-416 Roof Replacement of Salt Sheds – Bethlehem, Cornwall, Danbury
The Connecticut Department of Transportation’s (Department) Office of Engineering is developing plans for the roof replacement of the existing salt sheds located at Route 190 and 346 Main Street South in Bethlehem, 24 Bunker Hill Road in Cornwall and 7 Rockwell Road in Danbury.
-
7/24/2019
Replacement of Bridge 06676, Route 1 Over Unnamed Brook in East Lyme
The Connecticut Department of Transportation is announcing that a bridge replacement project will begin on August 12, 2019, on Route 1 over an unnamed brook in East Lyme near Heritage Road.
-
7/23/2019
Nighttime Bridge Maintenance on Merritt Parkway in Trumbull
The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on the Merritt Parkway (Route 15) northbound and southbound in Trumbull, Wednesday, July 31, through Friday, August 29, 2019. Work hours will be 8 p.m. to 5 a.m.
-
7/23/2019
Lane shift for stage 2 construction on I-84 West Exit 54 to Downtown Hartford by way of Founders Bridge
The Connecticut Department of Transportation is announcing the lane shift on I-84 West Exit 54 to the left for stage 2 construction of bridge 2367 on Monday July 29, 2019. The current two thru lanes of travel will be maintained. The HOV lane on I-84 west Exit 54 and the Route 2 West Exit 3 ramp to Darlin Street will remain closed until October 19, 2019.
-
7/23/2019
Scheduled Closure and Detour of River Road Between Rooster Tail Hollow Road and 119 River Road in New Milford
The Connecticut Department of Transportation is announcing the scheduled closure and detour of River Road between Rooster Tail Hollow Road and 119 River Road in New Milford to facilitate construction activities for the rehabilitation of Bridge 09200R on the Housatonic Railroad. The closure will begin Friday, August 2, at 7 AM and last until August 12, 2019 at 5 AM.
-
7/23/2019
Rubberized Chip Seal Projects in Colchester, Preston, Griswold, Eastford, Woodstock, Stonington, Windham and Guilford
The Connecticut Department of Transportation is announcing that an asphalt rubber chip seal project will begin on August 12, 2019, on Route 149 in Colchester, Route 165 in Preston and Griswold, Route 171 in Eastford and Woodstock, Route 201 in Stonington, Route 203 in Windham, and Route 77 in Guilford.
-
7/23/2019
Nighttime Bridge Maintenance on Merritt Parkway in New Haven, Hamden, and North Haven
The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on the Merritt Parkway (Route 15) northbound and southbound in New Haven, Hamden and North Haven, Wednesday, July 31, through Friday, August 29, 2019.
-
7/22/2019
Guiderail Installation along I-95 in Greenwich
The Connecticut Department of Transportation is announcing that a safety improvement project will be performed on I-95 northbound and southbound in Greenwich, beginning Monday, July 1, through Friday, August 16, 2019.
-
7/22/2019
Pipe Replacement along on Route 89 - Fish Point Road - in Union
The Connecticut Department of Transportation is announcing that a metal pipe replacement project will be performed on Route 89 in Union, Tuesday, July 23, through Friday, July 26, 2019.
-
7/22/2019
Nighttime Resurfacing Project on Route 8 Southbound in Bridgeport
The Connecticut Department of Transportation is announcing that a nighttime milling and resurfacing project will be performed on Route 8 southbound in Bridgeport, Sunday, July 28, through Monday, September 9, 2019.
-
7/22/2019
Safety Improvements along Route 8 Southbound in Bridgeport
The Connecticut Department of Transportation is announcing that roadside safety improvements will be performed on Route 8 southbound (Exit 3, Main St) in Bridgeport, Monday, July 29, through Friday, August 2, 2019.
-
7/22/2019
Nighttime Bridge Project on I-395 Northbound and Southbound in Putnam
The Connecticut Department of Transportation is announcing that a nighttime bridge membrane project will be performed on I-395 northbound and southbound in Putnam, beginning Friday, July 26, 2019.
-
7/22/2019
Nighttime Resurfacing Project along Route 5 (Broad Street) in Meriden
The Connecticut Department of Transportation is announcing that a nighttime milling and resurfacing project will be performed on Route 5 (Broad Street) in Meriden, beginning Sunday, July 28, 2019.
-
7/22/2019
Resurfacing along Route 69 - Milford Street - in Burlington
The Connecticut Department of Transportation is announcing that a resurfacing project will be performed on Route 69 in Burlington, Tuesday, July 23, through Tuesday, August 6, 2019.