Construction News from the Connecticut Department of Transportation - 2019
Page 11 of 22
-
8/19/2019
Proposed Plans for Removal/Closure of Miller Street Access to Route 9 in Middletown
The Connecticut Department of Transportation’s (Department) Office of Engineering is developing plans for the removal/closure of the Miller Street Access to Route 9 in Middletown.
-
8/19/2019
Proposed Upgrades to Roundabout at Route 162 and 705 (Ocean Avenue) in West Haven
The Connecticut Department of Transportation’s (Department) Office of Engineering is developing plans to improve the existing roundabout at Route 162 and SR 705 (Ocean Avenue) in the West Haven.
-
8/19/2019
Scheduled Temporary Closure of Harvard Avenue in Stamford on August 22 and August 23, 2019
The Connecticut Department of Transportation is announcing that Harvard Avenue in Stamford will be closed temporarily to facilitate the replacement of a damaged fascia beam for Bridge 00022 carrying I-95 northbound over Harvard Avenue. The closure will occur on 2 consecutive nights, Thursday and Friday, August 22 & 23, 2019, from 10:00 p.m. to 6:00 a.m. Exit 6 ramps will remain open during the closure. Local motorists will be provided a short detour around the work area.
-
8/14/2019
Public Hearing – Project No. 0080-0128, I-84 Interchange 17 Improvements, Construction of Chase Parkway Extension, and Operational Improvements on Route 63, Route 64, and SR 845 in Middlebury and Waterbury
The Connecticut Department of Transportation (Department) will conduct a public hearing concerning the proposed I-84 Interchange 17 improvements, construction of Chase Parkway extension, and operational improvements on Route 63, Route 64, and SR 845 on Tuesday, September 10, 2019 at Crosby High School, 300 Pierpont Road, Waterbury, CT 06705. An open forum for individual discussions with Department officials will begin at 6:00 p.m., followed by a formal presentation at 6:30 p.m
-
8/14/2019
Closure of Route 34 in from Route 111 to Bridge Street
The Connecticut Department of Transportation is announcing that Route 34 will be closed from Route 111 in Monroe to Route 110 in Shelton for the construction of the Derby Pump Station, Friday, August 16, through Monday, august 19, 2019.
-
8/14/2019
Public Hearing – Project No. 0080-0128, I-84 Interchange 17 Improvements, Construction of Chase Parkway Extension, and Operational Improvements on Route 63, Route 64, and SR 845 in Middlebury and Waterbury
The Connecticut Department of Transportation (Department) will conduct a public hearing concerning the proposed I-84 Interchange 17 Improvements, construction of Chase Parkway Extension, and operational improvements on Route 63, Route 64, and SR 845, on Thursday, September 5, 2019 at the Shepardson Community Center, 1172 Whittemore Road, Middlebury, CT 06762. An open forum for individual discussions with Department officials will begin at 6:00 p.m., followed by a formal presentation at 6:30 p.m.
-
8/13/2019
Nighttime Resurfacing along Route 1 - Boston Post Rd - in Milford
The Connecticut Department of Transportation is announcing that a nighttime milling and resurfacing project will be performed on Route 1 in Milford, Sunday, August 18, through Wednesday, September 25, 2019.
-
8/13/2019
Tree Removal along I-291 in Windsor
The Connecticut Department of Transportation is announcing that a tree removal operation will be performed on I-291 eastbound and westbound between Exits 1 and 4 in Windsor, Monday, August 19, through Friday, September 6, 2019.
-
8/12/2019
Motorist Reminder: Route 1 in Stamford over I-95 (Including Two I-95 Ramps) Scheduled to Temporarily Close for the Weekend of August 16, 2019
The Connecticut Department of Transportation is announcing that the Route 1 (East Main Street) Bridge over I-95 at Exit 9 in Stamford will be temporarily closed to install approach slabs for the newly installed bridge beginning on Friday, August 16, 2019, at 6 PM, until Sunday, August 18, 2019, at 6 PM. In addition, the Exit 9 southbound off-ramp and the Route 1 northbound on-ramp will be also be closed. Both I-95 ramps at Seaside Avenue as well as the Exit 9 northbound off-ramp and northbound on-ramp, will be remain open to motorists throughout the weekend.
-
8/11/2019
VMS Sign Replacements – Greenwich, Stamford, Norwalk, Westport
The Connecticut Department of Transportation’s (Department) Office of Engineering is developing plans for the replacement and installation of variable message signs on I-95 and Route 7 in Greenwich, Stamford, Norwalk and Westport.
- 8/5/2019 Pipe Replacement on Mt Parnassus Road in East Haddam - Detour Required
-
8/5/2019
Nighttime Resurfacing on Route 110 - Main Street - in Stratford
The Connecticut Department of Transportation is announcing that a nighttime milling and resurfacing project will be performed on a 1.7-mile segment of Route 110 (Main Street) in Stratford, Sunday, August 11, through Thursday, September 5, 2019.
-
8/5/2019
Nighttime Bridge Maintenance along Route 15 in Wallingford and North Haven
The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on the Wilbur Cross Parkway (Route 15) north and south in Wallingford and North Haven, Monday, August 12, through Friday, September 13, 2019.
-
8/4/2019
Guiderail Upgrade on I-84 Eastbound at Exit 50 in Hartford
The Connecticut Department of Transportation is announcing that a guiderail upgrade will be performed on I-84 Eastbound at Exit 50 in Hartford on Monday, August 12, 2019.
-
8/4/2019
Tree Removal along the Merritt Parkway in Greenwich
The Connecticut Department of Transportation is announcing that the tree removal operation will continue