Route 8 Deficiencies and Needs Study Int. 22-30
Prepared by the Connecticut Department of Transportation in cooperation with Vanasse Hangen Brustlin, Inc (VHB), the Valley Council of Governments (VCOG) and the Council of Governments of Central Naugatuck Valley (COGCNV).
Final Report
Cover and Table of Contents ( 0.2 MB)
Chapters 1 and 2 – Introduction and Existing Transportation Conditions ( 1.5 MB)
Chapter 3 – Existing Environmental Conditions ( 0.2 MB)
Chapters 4 and 5 – Future Transportation Conditions and Deficiencies and Needs Summary ( 0.9 MB)
Chapters 6 and 7 – Alternative Screening Process and Recommendations ( 25.5 MB)
Final Report Appendices Appendix A - Cost Estimates ( 0.9 MB)
Appendix B - Correspondence ( 1.2 MB)
Interim Technical Memorandum #2 Screening Analysis of Alternatives ( 32.5 MB)
Interim Technical Memorandum #1 Cover and Table of Contents ( 320 KB)
Chapters 1 and 2 – Introduction and Existing Transportation Conditions ( 500 KB)
Chapter 3 – Existing Environmental Conditions ( 780 KB)
Chapters 4 and 5 – Future Transportation Conditions and Deficiencies and Needs Summary ( 300 KB)
Interim Technical Memorandum #1 Appendices Existing and Future Transportation Conditions Graphics ( 8.4 MB)
Existing Environmental Constraints Mapping ( 9.0 MB)
Questions pertaining to these documents should be submitted to: David M. Head Transportation Supervising Planner Intermodal Planning Bureau of Policy and Planning Connecticut Department of Transportation P.O. Box 317546 Newington, CT 06131-7546