Engineering and Construction Information Resources
Specifications and Standards
Form 816/Form 817 (Standard Specifications) with Supplements
Plans, Policies, Regulations
Connecticut Bicycle and Pedestrian Plan
Locally Coordinated Public Transit Human Services Transportation Plan
Long Range Transportation Plan
Transportation Infrastructure Capital Improvement Plan
Consultant Engineer’s General Memoranda
Procedure Manual for New or Revised Interstate Access Approval in Connecticut
Policy and Procedures for Property Maps
Public Service Facility Policy and Procedures for Highways
Office of State Traffic Administration Regulations
Environmental Review Request (ECPPD-2017-1)
Engineering & Construction - Policy & Planning Directives
Assignment of Coordinated Environmental Roles (ECPPD-2017-2)
Expedited Permit Need Determination Form (PNDF) Process for Projects (2017-1)
Engineering & Construction - Policy & Planning Bulletins
Interagency Coordination Meeting Guidance (ECPPB-2017-1)
Engineering and Construction Directives
Framework for Guidance and Direction (2015-1-EC)
Consulting Engineer Staff Wage Rate Changes Cost Plus Fixed Fee Agreement (2015-2-EC)
Standard Specifications Committee and Specifications (2015-3-EC)
Alternative Project Delivery Advisory Committee (2015-4-EC)
Release of CAD Files (2015-5-EC) SUPERCEDED BY Electronic Engineering Data Delivery, Phase 1 (ECD-2017-4)
Proprietary Products in Construction Contracts (ECD-2016-1)
Plans-In-Hand Review (ECD-2016-2)
Online Stormwater Discharge Permit Registration System (ECD-2016-3)
Coding FHWA Participating and Non-Participating Costs (ECD-2016-4)
Minimum Daily Liquidated Damage Rates (ECD-2016-5) Superseded
Design Issue Procedure (ECD-2016-6)
Construction Contract Time Determination (ECD-2016-7)
Delegation of Authority (ECD-2016-8)
Use of All-Inclusive Drainage Items in Contract (ECD-2017-1)
Implementation of Smart Work Zones Guide (ECD-2017-2)
Conversion to Digital Contractor Submissions (ECD-2017-3)
Electronic Engineering Data Delivery, Phase 1 (ECD-2017-4)
Emergency Declaration Procedures (ECD-2018-1)
Penetrating Sealer Protective Compound (ECD-2018-2)
ECD-2019-1 Revised Minimum Daily Liquidated Damage Rates
ECD-2019-2 Revised Consulting Engineer Staff Wage Rate Changes
ECD-2019-3 DESIGN SERVICES DURING CONSTRUCTION (DSDC) AND REVIEW
OF SHOP DRAWING SUBMITTALS
ECD-2019-6 Contractor Quality Control Implementation
ECD-2019-7 Assignment of Prequalification Work Classifications
ECD-2019-8 Process for Determining MASH-Compliant Roadside Safety Hardware
ECD-2019-9 Unmanned Aircraft Systems
ECD-2019-10 Delegation of Authority
ECD-2019-11 Procedures for Identifying and Removing Encroachments within Project Limits
ECD-2019-12 Managing Project Staff in COMPASS
ECD-2019-13 Proposed Roadway Closures
Engineering and Construction Bulletins
Mileage Reimbursement Rate (ECB-2016-1)
Revised Special Provisions, Construction Field Office/Furnishings and Equipment (ECB-2016-2)
Implementation of Standard Specifications, Form 817 (ECB-2016-3)
Buy America Clarification and Guidance (ECB-2016-5)
Bituminous Concrete Specifications, Sections 4.06 and M.04 (ECB-2016-6) Superseded
Revised Special Provision Control and Removal of Invasive Vegetation (ECB-2017-1)
Membership Change, Alternative Project Delivery Advisory Committee (ECB-2017-3)
Channel Bottom Material Updates (ECB-2017-4)
Owned Special Provisions Sections 6.03 (Structural Steel) and M.06 (Metals) (ECB-2018-1)
New and Revised Interstate Access Approval (ECB-2018-2)
Electronic Engineering Data Delivery Extended Goal (ECB-2018-3)
Equipment Watch Access (ECB-2018-4)
Incidental Cost Percentages (2018) (ECB-2018-5)
Update of Stewardship Implementation Manual (May 2018) (ECB-2018-6)
Revised Bituminous Concrete Specifications, Sections 4.06 and M.04 (ECB-2018-7)
Public Involvement for FHWA Categorical Exclusion Projects Quick Reference Guide (ECB-2018-8) (Updated 01/02/2019)
Requirements for use of Digger Derricks (ECB-2019-1)
Review Process for Preliminary Permit Plan Sets (ECB-2019-2)
ECB-2019-9 Update of Stewardship Implementation Manual (July 2019)
ECB-2019-10 New Owned Special Provision Metallizing Structural Steel
Engineering Directives
Development, Approval, and Use of Standard Sheets and Guide Sheets/Details (2015-1-E)
Revised Standard Sheets Issued (2015-2-E)
Revised Traffic Engineering Guide Sheets Available (2015-3-E)
Digital Review of Design Submissions (2015-4-E)
Use of "Safety and Public Convenience" Special Provision (2015-5-E)
State Funded Municipal Projects, Requirements for Right of Way Acquisitions (2015-6-E)
Use of "PDF Checker" Software (2015-7-E)
Design Phase Scheduling (2015-8-E)
Employee Expectations Meeting (ED-2016-1) SUPERCEDED BY Employee Expectations Meeting (2018 Update) (ED-2018-2)
Advertising-Phase Activities (ED-2016-2)
Type D Portable Impact Attenuation System (ED-2016-3)
DBE Participation in Engineering Agreements (ED-2016-4)
Employee Time Record Keeping and Project Billings (ED-2016-5)
Consultant Design Administration Manual (ED-2016-6)
MASH Implementation: Additional Information, Phase One (ED-2017-1)
Storing Engineering Project Documents in Projectwise (ED-2017-2)
Consolidating Contract Plan Discipline Subsets (ED-2018-1)
ED-2018-2 Employee Expectations Meeting (2018 Update)
Revised Connecticut Bicycle and Pedestrian Travel Needs Assessment Form (ED-2018-3)
Fencing at Bridges (ED-2018-4)
ED-2019-5 Project Cost Estimates
ED-2019-7 Accessibility Guidelines in the Public Right-of-Way (PROWAG)
ED-2019-8 Department of Transportation Separate Storm Sewer Systems (DOT MS4) Procedures
ED-2019-9 Federal Transit Administration (FTA) Architectural and Engineering (A&E) Agreements
Engineering Bulletins
Revised Traffic Engineering Standard Sheets Issued (EB-2015-1)
Precipitation Frequency Estimates (EB-2015-2)
2016 Cost Estimating Guidelines (EB-2016-1)
Fiscal Year 2017 Local Bridge Program Manual (EB-2016-2)
Local Transportation Capital Improvement Program (LOTCIP) Guidelines (EB-2016-3)
Availability and Use of Bridge Load Rating Manual (EB-2016-4)
Change in Cutoff Time for Submitting Pre-Bid Questions through Web Page (EB-2016-5)
Update of Design-Phase Schedule Template (EB-2016-6)
Superpave Traffic Level Information in Contract Documents (EB-2016-7)
Revisions to the Bridge Inspection Manual (EB-2016-8)
2017 Cost Estimating Guidelines (EB-2017-1)
Revisions to Bridge Inspection Manual (May 2017) (EB-2017-2)
Interim Guidance: MASH Implementation, Roadside Barriers (EB-2017-3)
Revised Highway Standard Sheets Issued (June 2017) (EB-2017-4)
Revised Traffic Sheets Issued (June 2017) (EB-2017-5)
Accelerated Bridge Construction Decision Matrix (EB-2017-6)
Information Requirements, Environmental Compliance Task 100 Reports (EB-2018-1)
Revised Bridge Load Rating Manual (EB-2018-2)
Revised Traffic Guide Sheets (EB-2018-3)
Revised Traffic Standard Sheets Issued (EB-2018-4)
Process for Obtaining a Waiver of Right-Of-Way (ROW) Activities (EB-2018-5)
Revised Highway Standard & Guide Sheets Issued (EB-2019-1)
Revisions to Bridge Inspection Manual (EB-2019-2)
EB-2019-3 PE and CN Project Authorization Letters (PAL) and Authorization to Award Letters
EB-2019-4 April 2019 Local Bridge Program Manual
EB-2019-5 Notice to Contractor Pre-Bid Site Visit Metro North
EB-2019-6 Revised Bridge Design Manual
EB-2019-7 Local Transportation Capital Improvement Program (LOTCIP) Guidelines
EB-2019-8 Revised Highway Standard & Guide Sheets Issued
EB-2010-10 Update of Design-Phase Schedule Template
EB-2019-11 Revised Highway Standard & Guide Sheets Issued
EB-2019-12 Bridge Inspection Manual Revision No. 4
EB-2019-13 Revisions to the Bridge Design Manual
EB-2020-1 January 2020 Revised Geotechnical Manual
EB-2020-2 Revised Highway Standard & Guide Sheets Issued
Construction Directives
Construction Procedure for Internal use of Electronic Signatures (CD-2016-1)
Work Zone Safety, Rolling Road Block Procedure (CD-2016-2)
Reporting on Project Milestones and Key Dates (CD-2016-3)
Task-Based Consultant Services, Construction Engineering Inspection (CD-2016-4)
Construction Division Use of Projectwise for Storage of Project Documents (CD-2016-5)
Project Summary Reports (CD-2016-6)
Construction Employee Time Record Keeping and Project Billings (CD-2017-1)
Construction Manual Update/Version 3.0 January 2017 (CD-2017-2)
Revised Contractor Performance Evaluation Form and Guide (2017) (CD-2017-3)
Project Modifications and Contingency Management (CD-2017-6)
Consultant Solicitation Request for the Office of Construction (CD-2017-8)
Construction Division Procedures for the Use of Electronic and Digital Signatures (CD-2017-10)
Overtime Use and Approval (CD-2018-1)
Construction Division Procedures for the Use of Electronic and Digital Signatures (CD-2018-2)
CD-2019-1 Storage of Project Related Documents in ProjectWise
CD-2019-2 Construction Manual Update/Version 3.1 January 2020
Construction Bulletins
Revisions to Extension of Time Approval Memorandum (CB-2016-1)
Field Office Device Order Form and Field Office Date line Setup Form (CB-2016-3)
2015 OOC Performance Record (CB-2016-4)
Revised Construction Site Environmental Inspection Report (CB-2016-5)
Guidance for the Visual Inspection of Foreign Steel (CB-2017-1)
New CLA-12 - Request to Subcontract Form (Rev 07-2018) (CB-2018-1)
Post Construction Reviews (PCRs) – Updated Guidance (CB-2018-2)
New Non-Compliance/Compliance Notice Form (CB-2019-1)
CB-2019-2 State Police Services for Work Zone Safety
Manuals
Construction Contract Bidding & Award Manual
Consultant Design Administration Manual
Digital Project Development Manual
Professional Services, Consultant Selection Procedures Manual
Public Involvement Guidance Manual
Traffic Control Signal Design Manual
Guides
Constructability Review Program
Digital Design Environment Guide
Guidelines, Advertising-Phase Activities
Guidelines for Soil Erosion and Sediment Control
Guidelines for the Local Transportation Capital Improvement Program (LOTCIP)
SELECTSeries Digital Design Environment
Price Adjustment (Asphalt, Fuel) Guidance
Programmatic Agreement for Certain Categorical Exclusions and Fact Sheet rev. September 2015
Public Involvement for FHWA Categorical Exclusions Quick Reference Guide
Review Process for Preliminary Permit Plan Sets
Guidelines for Aesthetic Objects and Treatments within CTDOT ROW (Public Art)
Other Information
AASHTOWare Product information
Collision Analysis System Reports
Consulting Engineer General Memoranda
Department District Boundaries (Map)
Functional Classification Maps
National Highway System (Connecticut) Map
Performance Measures (Department)
Specifications for Aerial Photography and Photogrammetric Mapping
Stewardship Agreement (Joint Stewardship & Oversight Agreement)