To support essential travelers during the COVID-19 public health crisis, CTDOT has launched a temporary program for food trucks to operate at highway Rest Areas in Danbury (I-84), Middletown (I-91), Wallingford (I-91) and North Stonington (I-95). Read more here: Food Trucks Temporarily Permitted at CTDOT Highway Rest Areas

 

State Bridge Design 

 

Division 1 - Standard Design Practices and Procedures (Full Download)

Section 1 - General Design Requirements  (Rev. 12/19)

Section 2 - Design Submissions & Contract Documents  (Rev. 12/19)

Section 3 - Loads and Load Factors  (Rev. 12/19)

Section 4 - Structural Analysis and Evaluation  (Rev. 04/19)

Section 5 - Abutments, Piers and Walls  (Rev. 12/19)

Section 6 - Concrete Structures  (Rev. 12/19)

Section 7 - Steel Structures  (Rev. 04/19)

Section 8 - Decks and Deck Protective Systems  (Rev. 12/19)

Section 9 - Bearings  (Rev. 12/19)

Section 10 - Deck Joints  (Rev. 12/19)

Section 11 - Surface Drainage

Section 12 - Bridge Rails and Barriers  (Rev. 12/19)

Section 13 - Buried Structures  (Rev. 12/19)

Section 14 - Sign Supports  (Rev. 04/19)

Section 15 - Utility Installations  (Rev. 04/19)

Section 16 - Bridge Repair & Rehabilitation (Vacant)

Section 17 - Post Design Responsibilities (Vacant)