To support essential travelers during the COVID-19 public health crisis, CTDOT has launched a temporary program for food trucks to operate at highway Rest Areas in Danbury (I-84), Middletown (I-91), Wallingford (I-91) and North Stonington (I-95). Read more here: Food Trucks Temporarily Permitted at CTDOT Highway Rest Areas

COLLABORATION SYSTEM
ProjectWise
Resources                             
                      
Instructional Videos                
Main Videos
Supplemental Videos
Digital Contract Workflows
Overview

ProjectWise (PW) Online is CTDOT's current document management system for all capital project contract documents (plans, specifications and other contract documents) and Asset documents. 

PW Online is a cloud based database with access through both a thick and thin client interface.  The thick client interface uses a software called ProjectWise Explorer that offers integration with Microstation, InRoads and Microsoft Office and is primarily used within the CTDOT main office in Newington.  The thin client interface is accessed through the web increasing mobility to external users and consultant engineers.

PW Online gives CTDOT robust document management and workflow utilities to maintain version control and eliminate document duplication.   Additionally PW Online allows for robust securities,  accessibility through the cloud and geospatial attribution of projects and assets.

Along with current design and construction plans, specifications and other contract documents there is a large data set of as-built recorded legacy project plans.  In addition to project data, bridge and sign support structure inventory inspection information is being managed with asset to project tagging.  

Going forward additional high value Electronic Engineering Data (EED) is targeted for collection at final design submission.  This EED will include three dimensional models, a byproduct of the design process that has shown an increase in demand by the contracting industry and FHWA.  Further EED information targeted will be asset installation/rehabilitation documents like shop and working drawings for bridges, retaining walls, structure sign supports and traffic signal equipment.   

Projectwise Terms and Conditions: 

Requests for additional information or

comments should be addressed to: 

William S. Pratt, P.E. 
Transportation Principal Engineer
Phone:(860) 594-3320
Email: William.Pratt@ct.gov