02/13/2019
Nighttime Lane Closures for Bridge Maintenance on I-91 Southbound in Hartford.
The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project for concrete deck repairs will be performed on Bridge#1469B (State Route 598 overpass), on I-91 southbound (south of Exit 29A in Hartford).
This work is scheduled to occur on Friday, February 15, 2019 until work is completed. Work hours will be 9 p.m. to 5 a.m.
This work is being performed by State Forces.
LANE CLOSURE INFO
Motorists can expect lane closures. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone.
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.
FOR FURTHER INFORMATION:
OFFICE OF COMMUNICATIONS
TELEPHONE: (860) 594-3062
FAX: (860) 594-3065
WEB SITE: www.ct.gov/dot