09/24/2019
Illumination Project in West Rock Tunnel in Woodbridge and New Haven
The Connecticut Department of Transportation is announcing that an illumination repair project will be performed on Route 15 (Wilbur Cross Parkway) in Woodbridge and New Haven on Saturday, October 5, 2019.
The project consists of replacing the lighting in the West Rock Tunnel on Route 15 in Woodbridge and New Haven.
State forces are performing this work.
LANE CLOSURE INFO
Motorists can expect lane closures to occur on Route 15 in Woodbridge, New Haven and Hamden between Exit 58 (Route 34, Derby Turnpike) and Exit 60 (Route 10, Dixwell Ave). Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The southbound side of the tunnel will have alternating traffic proceeding through while the northbound side of the tunnel will be closed to traffic. The regular work schedule for this project is from 6:00 a.m. to 2:00 p.m.
Motorists should be aware that modifications or extensions to this schedule might become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.
FOR FURTHER INFORMATION:
OFFICE OF COMMUNICATIONS
TELEPHONE: (860) 594-3062
FAX: (860) 594-3065
WEB SITE: www.ct.gov/dot