To support essential travelers during the COVID-19 public health crisis, CTDOT has launched a temporary program for food trucks to operate at highway Rest Areas in Danbury (I-84), Middletown (I-91), Wallingford (I-91) and North Stonington (I-95). Read more here: Food Trucks Temporarily Permitted at CTDOT Highway Rest Areas

CONNECTICUT DEPARTMENT OF TRANSPORTATION
NEWS RELEASE
2800 BERLIN TURNPIKE P.O. BOX 317546
NEWINGTON CONNECTICUT, 06131-7546
FOR RELEASE: March 3, 2017
FOR FURTHER INFORMATION:
OFFICE OF COMMUNICATIONS
TELEPHONE: (860) 594-3062
FAX: (860) 594-3065
WEB SITE: www.ct.gov/dot

Replacement of Bridge 02738, Route 169 over Gravelly Brook in Woodstock
The Connecticut Department of Transportation is announcing that construction work will begin on April 1, 2017, on the replacement of Bridge 02738, Route 169 over Gravelly Brook in the Town of Woodstock.
The bridge will be replaced with a precast box culvert and precast wingwalls. The existing structure is a 9-foot long single span reinforced concrete slab founded on stone masonry abutments with a gunite cover. The wingwalls are also stone masonry with a gunite cover. The bridgewill be replaced with a 10 ft. x 9 ft. precast concrete box culvert buried a minimum of 1 foot below natural stream bed material. The new structure will be installed using Accelerated Bridge Construction (ABC) methods and involves a road closure of Route 169 at the bridge location.
DOT Project No. 0169-0128 was awarded to New England Infrastructure, Inc. at a cost of $1,153,271.00 on October 19, 2016 and is scheduled to be completed November 17, 2017. 
LANE CLOSURE INFO
Traffic impacts may occur periodically Monday through Friday, between 7:00 a.m. and 8:00 p.m.
Route 169, just north of County Road, will be detoured while the demolition and construction of the new bridge is performed. The detour will occur for a 4-week period between July 5, 2017, and August 30, 2017. Specific dates of the detour will be published in a future press release.